EPCEV charging projects · India

Charging. Nothing else.

EV charging EPC for projects, campuses, dealerships and depots. We choose it, build it and run it.

  • We chooseAC and qualified DC hardware
  • We buildOur own EPC crews
  • We runOur own operations

Who we build for

Pick your project type.

Each buyer has a different site, approval path and handover. Choose yours to see what the project covers.

Builders & developers

Charging designed into the project from the drawings stage, handed over with the building.

Typical scope

  • Load planning in the building's electrical design
  • Common-area and visitor charging bays
  • Ducting for future resident chargers
  • Handover documents for the society

How a project runs

Six stages. A document at the end of each.

You see the work before you sign off the next step.

  1. Site audit

    Engineer visits the site, checks parking layout, existing supply and cable routes.

    You getSite audit report with photos

  2. Electrical design

    Load study, charger mix and placement, cable sizing, protection design.

    You getSLD, BOQ, layout drawing

  3. Approvals

    DISCOM application for the EV connection and electrical inspection before energising.

    You getResponsibility matrix and application status

  4. Civil & electrical EPC

    Trenching, foundations, panels, earthing and cabling by our own crews.

    You getEarth test log, as-built cable route map

  5. Commissioning

    Each charger is tested on our software with a live session before handover.

    You getCommissioning sheet per charger

  6. Operations

    Monitoring, remote reset, field dispatch and periodic maintenance after handover.

    You getMonthly operations report

In writing, before you pay

Deliverables, not promises.

Every one of these is handed to you as a document. Payments follow proof.

  1. D-0172-hour load studyMeasured load on your existing supplyDesign
  2. D-02Single line diagram (SLD)Signed electrical schematicDesign
  3. D-03BOQCable sizes and breaker ratings, line by lineDesign
  4. D-04DISCOM / CEIG responsibility matrixWho files what, and whenApprovals
  5. D-05Earth test log per chargerMeasured values, date and engineerBuild
  6. D-06As-built cable route mapWhat went in the ground, and whereBuild
  7. D-07Factory test certificatesFor every charger suppliedHardware

You pay on proof

Five milestones. The last 10% after 60 defect-free days.

  1. 15%On signing and site audit report
  2. 40%On hardware delivery to site
  3. 20%On installation and earth test log
  4. 15%On commissioning and handover documents
  5. 10%After 60 defect-free days of operation

Knowledge

Short answers from our engineers.

One topic per card. Open a card for the detail.

Straight answers

Before you ask.

  1. Usually not. PM E-DRIVE does not cover most private sites. We will tell you during the site audit if a state scheme applies.

Let's plan your next step

Project enquiry.

Tell us about your EV charging project, where you are in your planning, and how we can reach you.

EPC SolutionsProject enquiry

Tell us about your EPC project.

Share a few details so our team can help with your EV charging project.


Your details
Your project

* Required fields. We use these details only to share our EPC information and to contact you about your project.